Skip to content
  • TOP
  • Message
  • Overview
  • Inquiry
  • Site Map
  • 日本語
  • English
  • 中文 (中国)

ERTjapan

電力業界の現状分析と未来予測

Category: Grid

Distributed Grid

Posted on 2020-12-15 by ERT

The Ministry of Economy, Trade and Industry is compiling the contents of each committee toward the revision of …

Read More “Distributed Grid”

Revision of Electricity Business Act 2020 No3(Delivery Information)

Posted on 2020-03-07 by ERT

This time, let’s look at the delivery information (more specifically, the 30-minute data of a smart mete …

Read More “Revision of Electricity Business Act 2020 No3(Delivery Information)”

3 Comments on Revision of Electricity Business Act 2020 No3(Delivery Information)

Revision of Electricity Business Act 2020 No1(OCCTO)

Posted on 2020-03-07 by ERT

A proposal to amend the Electricity Business Act will be submitted to this ordinary Diet. The bill will be a r …

Read More “Revision of Electricity Business Act 2020 No1(OCCTO)”

Distribution Grid, What is real Target?

Posted on 2020-03-07 by ERT

The Ministry of Economy, Trade and Industry(METI) is compiling the details of each committee’s review fo …

Read More “Distribution Grid, What is real Target?”

Chiba power outage. Why it will last longer. 2

Posted on 2019-09-23 by ERT

In the previous article, the reason why the power outage caused by Typhoon No. 15 was prolonged was described …

Read More “Chiba power outage. Why it will last longer. 2”

Chiba power outage. Why it will last longer. 1

Posted on 2019-09-232019-09-23 by ERT

The power outage due to Typhoon No. 15 has spread over almost the entire area of ​​Chiba Prefecture, and has b …

Read More “Chiba power outage. Why it will last longer. 1”

5 Comments on Chiba power outage. Why it will last longer. 1

Grid separation and executive personnel

Posted on 2019-05-20 by ERT

Director personnel of Tokyo Electric Power Holdings (HD) attracts attention from the power industry. President …

Read More “Grid separation and executive personnel”

1 Comment on Grid separation and executive personnel

Blackout in Hokkaido(3)

Posted on 2018-10-282020-11-21 by ERT

On the 25th of October, Organization for Cross-regional Coordination of Transmission Operators(OCCTO) summariz …

Read More “Blackout in Hokkaido(3)”

24 Comments on Blackout in Hokkaido(3)

Blackout in Hokkaido(2)

Posted on 2018-10-272020-11-21 by ERT

About Blackout in Hokkaido, many experts and media refer to the cause. Unfortunately, many are not necessarily …

Read More “Blackout in Hokkaido(2)”

12 Comments on Blackout in Hokkaido(2)

Blackout in Hokkaido

Posted on 2018-09-082020-11-21 by ERT

At 3:08 am on September 6, 2018, an earthquake with a maximum seismic intensity of 7 occurred in the Hokkaido …

Read More “Blackout in Hokkaido”

Health of Grid

Posted on 2017-11-262019-04-22 by ERT

Is Grid in Metropolitan area healthy or not? Tokyo Olympic Games are coming in 2020, that question is recently …

Read More “Health of Grid”

Separation of Grid

Posted on 2017-06-032019-04-22 by ERT

In 2020, Japanese Electric Power Company will separate their Grid from their own to subsidiary. Already, Tokyo …

Read More “Separation of Grid”

Recent Posts

  • What is Shadow Price in Simultanious Power Market?
  • Abolition of general collateral
  • Is it possible to continue long-term LNG contracts?
  • Transitional Tariff
  • What is conversion from FIT to FIP?
  • 日本語
  • English
  • 中文 (中国)
All rights reserved © ERTjapan Theme by Seos Themes
PAGE TOP